HEAT RECOVERY AND ECONOMISER SURVEY

Objective:

The specific objective for the survey is to provide a general overview of the existing boiler plant to determine the level of waste heat recovery possible from blowdown and exhaust flue gas. Prior to our technical staff undertaking a detailed survey in order to provide a detailed tender we request you complete the details below, from which we will determine a budget price and evaluate capital investment return timescale.


Company Name:
Site Address:
Company Contact: Position:
Telephone No: Email Address:

Basic Plant Details

Boilers Installed

Boiler 1

Boiler 2

Boiler 3

Boiler 4

Boiler Evaporation: 
Manufacturer: 
Boiler Serial Number: 
Operating pressure: 
Operating hours per day: 
Operating hours per year: 
Winter Steam load - Average: 
Winter condensate return % - Average: 
Summer Steam load - Average: 
Summer condensate return % - Average: 

Boiler Feed Tank Details

Feed tank temperature Winter - Average: 
Feed tank temperature Summer - Average: 

Fuel Details

Main fuel: 
Stand-by fuel 

Combustion System Details

Manufacturer: 
Burner Type: 
Main fuel cost per Kw/Hr: 
Stand-by fuel cost per Kw/Hr: 

Feed Water System Details

Manufacturer: 
On-Off Pump control:  

Boiler ancillary equipment fitted

TDS Monitered Blowdown: 
Timed Bottom Blowdown: 
Water Sample Cooler: 
Blowdown Heat/Flash Steam Recovery: 
Boilers sequenced to meet load conditions: 


Copyright Cochran Ltd ©2010. All rights reserved. Terms and Conditions Contact Us